ODL 17069000R Guía de instalación Pagina 6

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 63
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 5
6
Angled Tube Installation
In the attic, if there are obstructions at the roof
location (valleys, wires, pipes, ducts, framing, etc.),
adjust tubes up to a combined 45° angle to find a
path that avoids interference. Center the opening for
the tube between the framing members. Drive a nail
up into the roof deck and through the shingles.
2
Straight Tube Installation
In the attic, use a plumb line to nd a straight
location from the ceiling hole to the roof location.
Center the opening for the tube between the framing
members. Drive a nail up into the roof deck and
through the shingles.
1
1
Carpenter Pencil
Claw Hammer
Ladder
Measuring Tape
Phillips Screwdriver
Plumb Line
Safety Equipment
TOOLS & PARTS
2
Straight Tube Installation Angled Tube Installation
Dry-tting your tubing will help in determining
adjustablilty and need for additional extensions.
NOTE
Section-2
Locating The Roof Position
Vista de pagina 5
1 2 3 4 5 6 7 8 9 10 11 ... 62 63

Comentarios a estos manuales

Sin comentarios